“Clear communication is crucial for us. Not just amongst each other, but also toward the client. Our experienced personnel know exactly what our rigs can handle and what not – and are honest in sharing their assessment.”

Light Workover – Great Flexibility

A perfect interaction between our 14 winches and the team operating them results in an expedient, safe and swift process at your wellsite. Not only for standard operations, but also when flexibility is called for. It takes routine between man and machine to find a creative solution.

To keep loading and retooling times as short as possible – and your costs low – we use wireline trucks only for Light Workover tasks which can be driven directly to the wellsite without requiring a special permit. Next to the resulting savings, this also offers a great plus in flexibility and instant readiness whenever there are unforeseen production downtimes.

Services and fields of application

Our range of rigs with varying features manned by cross-trained, experienced teams enable us to carry out a number Light Workover tasks to exacting quality standards. Send us your inquiry – without obligation – to learn more about how we would approach your request as best and budget-friendly as possible.

  • Decommissioning, securing and disassembly of surface pump drive following customer approval

  • Back-off and pull-out of sucker rod

  • Replacement of pump

  • Installation of sucker rod incl. length adjustment for handover to operator

  • Functional test

  • Plugging wellbores according to regulations

  • Pumping of cement

  • Fishing and milling according to customer specifications
  • Fishing of e.g., casings, tubings, sucker rods, lost cables, sand filters, production packers

  • Milling of e.g., permanent packers, casings, bridge plugs, etc.

  • Dismantling of wellhead flanges and well packers

  • Removal of submersible pump incl. control line on cable spool

  • Configuration and run-in of ESP on production tubing with control line

  • ESP positioning plus commissioning

  • Killing of wells

  • Circulation operation at the wellbore

  • Well cleaning

  • Acid treatment

  • Pumping of annular protective fluids

  • Setting of packers

  • Release of setting tools

  • Opening of circulation systems (e.g., sliding sleeves)

  • Release of production packers

  • Removing and installing of tubing strings

  • Positioning of tubing string packers

  • Test of production tubing, annulus test, wellhead flange, BOP

  • Integrity test

  • Installation and dismantling of wellhead flanges

  • Installation, dismantling and configuration of wellheads

  • Production testing after perforation and acid treatment or to establish recoverability

  • First-time well completion

  • Removal of old well completion

  • Run-in of new well completion

  • Installation and removal of gravel pack assemblies

On-site personnel have been trained to handle:

  • Hydrogen sulfide
  • Kick and exit drills
  • Respiratory protection and gas measuring devices

This is why MB Well Services is the right partner for your project:

Our rigs are designed to meet maximum flexibility and economy and are always serviced to the highest standards.

20+ years of employment with our company are not the exception, but the rule. Consequently, every movement has been perfected.

Our seasoned experts will help you plan and implement your project first-hand and from one source.

Our Light Workover rigs

The diversity of our rig line-up is crucial to the flexibility of our solutions that are designed to meet your needs. For detailed information about specific hook loads, please refer to our Overview. What they all have in common: 

Thanks to our in-house engineering, they are always serviced to the highest standards.

Contact us now to secure our expertise!

We are happy to discuss with you whether our equipment and availability are a fit for your project parameters. Call us now or use our contact form.

Project-impressions

News/Insights