Rig T47 returns to the oil field after a 10-year-revision

Rig T47 returns to the oil field after a 10-year-revision

For a longer time, our T47 has been used by colleagues from MB2001 in Hungary. Even far away from home, safety and operational capability are paramount. To ensure this and obtain the necessary re-certifications, the rig was decommissioned in the second half of October to proceed the 10-year inspection. After dismantling, the substructure, rig floor with wind walls, mast and top were cleaned, technically checked, freshly painted and finally reassembled. The hydraulic power packs including all lines and hoses were also overhauled.

Most of the work was done by our sister company MB2001. Thanks to excellent cooperation with the employees of Max Streicher GmbH & Co. KG and the MB Well Services team in Salzwedel, the revision was completed within a very short time. The final report and the new certificates were handed over after re-commissioning in Hungary.

After this rejuvenation, the T47 continues its work in Hungary. This will continue until at least the end of this year.

Go back

+49 (0)3901 8352 - 0

Sie haben Fragen?
Rufen Sie uns gerne an!

Schreiben Sie uns eine E-Mail!